Demo by LeeMaster Design
Back to LeeMaster Design
All Services

Commercial Overhead Doors

High-cycle. Heavy-duty. Built for business.

From warehouse sectional doors to restaurant counter shutters, we design, install, and maintain commercial overhead door systems built for daily heavy use. We work with property managers, general contractors, and business owners to spec the right door for the application — factoring in cycle count, wind load, fire rating, and security requirements. Every commercial installation includes permitting coordination and ongoing maintenance options.

Get a Quote
Commercial Overhead Doors

Why Choose This Service

High-cycle systems rated for 100,000+ cycles — built for daily commercial use

Rolling steel, sectional, counter shutters, and fire-rated assemblies available

Wind-load rated options for coastal and high-wind zones

Permitting coordination and code compliance handled by our team

Preventive maintenance contracts to minimize downtime and extend system life

Our Process

01

Site Survey

We visit your facility, measure the opening, assess structural support, and discuss your operational requirements and budget.

02

Engineering & Spec

We spec the door system, motor, controls, and safety features. You receive detailed drawings and a fixed-price proposal.

03

Permitting & Fabrication

We handle all permit applications and inspections. Your door is fabricated to spec with typical lead times of 4–6 weeks.

04

Installation & Commissioning

Professional installation with minimal disruption to your operations. Full system commissioning, safety testing, and staff training included.

Frequently Asked Questions

How long does a commercial door installation take?

From initial survey to operational door, most commercial projects take 6–10 weeks. The installation itself is typically 1–2 days depending on the system complexity. We schedule around your business hours to minimize disruption.

Do you offer maintenance contracts?

Yes. Our preventive maintenance plans include quarterly inspections, lubrication, spring tension checks, safety system testing, and priority emergency service. Most commercial clients find that regular maintenance pays for itself by preventing costly emergency repairs.

Can you install fire-rated doors?

Absolutely. We install UL-listed fire-rated rolling steel and sectional doors in 1.5-hour and 3-hour ratings. We handle all permitting and inspection coordination for fire-rated assemblies.

Ready to get started
with commercial overhead doors?

Free estimates. Honest recommendations. Expert execution.